logo

Hereford Sixth Form College

Hereford 6th FormProject: Sports Building

Value: £1.2 million

Duration: 12 months

Client: Hereford Sixth Form College

Architect: Jim Morris Associates & Mark Owen Architects

Design and build project involving the erection of a steel frame structure that was partly cladded with brick work and Kingspan insulated panels. The curved roof designed caused many headaches, but with extremely efficient interactions between the architect and the construction team the building was made water tight retaining the original visual impact of the building.

The build also involved solar panels and rain water harvesting to ensure it was environmentally sustainable. Internal acoustic floors and walls were constructed to ensure the most efficient teaching environment.

Hereford 6th Form CloistersProject: Hereford Sixth Form Library Cloisters

Value: £120,000

Duration: 4 months

Client: Hereford Sixth Form College

Architect: Jim Morris Associates

Construction of a single storey extension to the existing college library. Works included a traditional brickwork and block-work structure with a tiled pitched roof. The project involved regular interactions with college staff to ensure the works were undertaken in a manor that minimised disruptions to the day to day running of the college.