Ledbury Colocation Centre

Project: Ledbury Colocation Centre

Value: £410,000

Duration: 7 Months

Timber frame extension to Ledbury Primary School to form the Co-Location Centre while maintaining the day-to-day activities of the school.

Technical attributes:

  • Heat recovery ventilation system.
  • Air permeability of 4.60 m3 h-1 m-2 (more than twice as better as requested)
  • Curved window to form a bright reception area
  • Full fire alarm and security system tying into the existing building
  • Aluminium doors and windows.
  • One way sound proof mirror between two internal rooms.
  • Suited locks